India · France · Europe
FRENGESIT中文한국어日本語DEIndia · ENहिन्दीالعربية繁體中文 · HK / TW
Practical tool

The evidence dossier for an industrial site project

An industrial project must explain what has been decided, what still needs study and what depends on authorisations. This kit organises that information into a working dossier. It does not establish public acceptance and is neither an impact assessment nor an authorisation.

Use the tool

Turn an expansion decision into a local stakeholder briefing

Indian headquarters considering a French facility can gather assumptions about jobs, skills, resources and timetable. The kit distinguishes existing resources, decisions taken and further studies needed, with owners at headquarters, the subsidiary and project partners.

Local questions are followed with their evidence and answers, including when they lead to a review of a hypothesis. The dossier prepares a factual dialogue; it does not replace technical studies, applicable procedures, or the participation of local actors.

Describe the project at its current stage

State the activity, proposed site, timetable and decisions already taken. Separate working assumptions, selected options and approved commitments. An announcement of intent is not proof of delivery. Preserve this distinction in materials for elected representatives, residents, partners and teams.

Document the contributions announced

For employment, specify roles, period, assumptions and the distinction between direct jobs and other estimated effects. For training, identify needs and confirmed partnerships. A prospect should not be presented as a signed agreement. Every figure links to a document, an owner and a review date.

Make resource needs and impacts understandable

Bring together available information on water, energy, transport, land and the surrounding area. Units and scope must support a meaningful discussion. Distinguish water withdrawal from consumption where these terms are used, and forecasts from observed measurements. Technical questions require appropriate expertise; a communications argument cannot replace an assessment.

Prepare dialogue that can change the project

Add questions received, answers, unknowns and options still open. Applicable procedures vary by project and must be checked. The kit helps make dialogue traceable; it does not reduce engagement to a way of securing approval. An objection can reveal missing information or a decision that needs reconsideration.

Track commitments after the announcement

Export the dossier with owners, deadlines and expected evidence. As the project evolves, document changes and their reasons. A withdrawn commitment should not simply disappear from the table. Good follow-up relies on verifiable information and clear access to answers, within the limits of information that can lawfully be published.

Illustrative scenario — no real observation

Illustrative example: a project announces jobs and forecast water consumption. The dossier distinguishes production assumptions, roles, estimated resource needs and studies still required before making firm promises to local audiences.

Illustrative scenario: this does not describe a client engagement or a result achieved by Belief System.

Deliverables and checkpoints

  • Evidence sheets for local project topics
  • Identified assumptions and dependencies
  • Questions and answers log
  • Exportable commitments tracker

What to prepare for an initial discussion

  • Define the project’s actual stage
  • Collect the available studies
  • Identify upcoming decisions and approvals
  • Name technical and local stakeholder contacts

Practical questions

Does the dossier replace an impact assessment?

No. It organises information for communications and dialogue; required studies and procedures remain separate.

Can a job number be promised before the final decision?

The figure’s status, assumptions and dependent decisions must be stated precisely and validated by the project owners.

Sources and scope

  1. CNDP — Decisions of 6 May 2026Public examples of industrial project follow-up and information provision; none of the decisions in this document concerns your own project.

These sources document the frameworks and methods discussed. Their authors do not endorse this page, and the references do not constitute legal advice on your circumstances.

Related advisory services

Prepare stakeholder dialogue for a new site