← Explore all contentPractical guide / Advisory and organisation

Several agencies, one objective: keep the communications director out of permanent coordination

Assign an overall owner, define interfaces and settle disagreements without making the communications director relay every task.

Several specialist partners can contribute to one objective while leaving nobody responsible for how their work connects. The communications director then becomes a permanent relay. Solve the interface problem explicitly: name the overall owner, define decisions retained by the client and establish how disagreements are resolved.

Define the shared outcome and dependencies

Map what each partner needs from the others and what the client must decide. Distinguish a content handover from approval of its underlying claim. An attractive integrated plan can still leave those practical dependencies unanswered.

Give coordination a real mandate

Choose an internal lead or an explicitly appointed coordinating partner. Define authority, availability and limits, including changes of scope or budget. Coordination should not silently confer power to approve another specialist’s facts or obligations.

The UK Consultancy Playbook addresses commissioning and knowledge transfer in public procurement.[1] The CIPR code addresses professional conduct for its members, including accuracy and confidentiality.[2] Neither reference establishes that every private business must use the same purchasing model.

Write the interfaces between partners

Each interface needs an input, output, owner and review point. Keep one decision log accessible to authorised participants. Partners can disagree directly about evidence or options; the client should receive the decision to make, not an unfiltered email chain.

InterfaceOwner providesReceiving party confirms
Facts to contentVerified scopeLimits preserved
Content to distributionApproved referenceCorrect version and timing
Disagreement to decisionOptions and consequencesNamed client decision
Change to deliveryUpdated scopeResources and dates accepted

Simulate a disputed launch decision

In the teaching scenario, let the media and production schedules conflict with local readiness. The lead should bring options, consequences and a recommendation. The communications director decides the business trade-off while the partners manage agreed execution.

A detailed teaching example brings a media interview forward while a production partner is still waiting for verified product facts. The overall lead presents three options: a narrower interview using confirmed information, a later announcement, or separate strategic and product communications. Each option states what changes for the audience, the timetable, the workload and the client decision. Forwarding the full email argument to the communications director is not an options paper.

The client chooses the business trade-off. The lead then updates the reference version, assigns the factual dependency and confirms the receiving partner’s deadline. A creative preference can be resolved within the agreed mandate, while a challenge to the truth of a claim remains visible until the competent owner addresses it. A coordinating partner does not gain authority to certify another specialist’s subject simply by managing the schedule.

Write a disagreement rule before the next conflict. The person escalating supplies the disputed point, available evidence, alternatives, recommended choice and latest useful decision time. Silence from the client is not automatic approval. Identify what can continue independently and what must wait, so a single unresolved sentence does not unnecessarily stop unrelated work.

After the exercise, inspect where the communications director still had to act as a messenger. Was the lead missing authority, capacity, evidence or an accepted interface? Change that specific condition. A shorter meeting calendar is not proof of better coordination if the same work has simply moved into private calls. This fictional exercise evaluates the flow of decisions and responsibilities, not a measured saving or a guaranteed campaign outcome.

Escalate choices, not every message

Define which disagreements require escalation and which the lead can settle. A challenge to evidence is different from a preference about wording. Keep dissent traceable where it affects risk; consensus obtained by hiding a reservation is not resolution.

Review the model against actual coordination work

Measure unresolved interfaces, duplicated work and time spent seeking decisions. Review whether the lead has enough authority and capacity. Fewer meetings alone do not demonstrate a better model if important coordination has simply become invisible.