An in-house campaign costs more than the invoices attached to it. Employees gather evidence, coordinate decisions, revise drafts and maintain material after launch. Internal production is neither free nor necessarily more expensive: the answer depends on scope, capability and the alternative use of time. A cost model should support a choice rather than validate an existing preference.
This guide uses a teaching simulation. Its hours and cost units are invented to make the calculation inspectable; they are not rates, productivity standards or client results. Replace them with company information while retaining the assumptions that allow someone else to understand the estimate.
1. Define the same deliverable on both sides
Specify objectives, audiences, formats, languages, acceptance criteria and the maintenance period. An external proposal including research, quality assurance and updates cannot fairly be compared with internal drafting time alone. The UK Sourcing Playbook compares in-house, external and mixed delivery through whole-life costs.[1] It offers a management approach, not a universal price or a legal requirement for international businesses.
Consider a simulated global technology company introducing a service in several European markets. The result includes confirmed technical claims, usable local explanations and a correction route. A central English asset may be reusable, but local questions are not necessarily solved by translation. Decide what must be adapted from evidence about the intended audience, not a blanket assumption about national preferences.
2. Map the work that the initial estimate misses
Trace the process from the first request to the final update. Separate preparation, creation, coordination, approval, revisions, distribution and maintenance. Include experts who own technical facts even when their time sits outside the communications budget. A short interview can require preparation and follow-up that are invisible in the final document.
GovS 011, the UK government communications standard updated on 30 November 2023, connects campaign plans with resources, accountability and evaluation.[2] Used within that stated scope, it suggests a useful practical question: who must do what before an asset becomes usable? Waiting is not always labour, but approval delays can change delivery dates and create costs in other parts of the project.
3. Calculate the total without double counting
| Teaching assumption | Quantity | Illustrative cost |
|---|---|---|
| Production | 60 hours × 50 units | 3,000 |
| Coordination | 20 hours × 50 units | 1,000 |
| Revisions and approval work | 20 hours × 50 units | 1,000 |
| Planned maintenance | 20 hours × 50 units | 1,000 |
| Separate external services | Assumed fee | 2,000 |
| Attributable tools and licences | Assumption | 500 |
| Total | 120 internal hours plus purchases | 8,500 |
The calculation adds hours multiplied by a finance-approved internal cost rate, then purchases attributable to the agreed scope. A single rate of 50 simplifies the exercise; it is not a recommended rate. Actual roles may have different cost bases, and overhead allocation must follow a consistent policy. State the treatment of taxes and shared resources rather than silently changing it between options.
Do not include the same licence in both the loaded rate and purchases. Distinguish economic cost from immediate cash savings: assigning fewer employee hours to this project does not automatically reduce payroll. Released time may support valuable work elsewhere, but name that work instead of converting a speculative opportunity into a financial gain.
4. Test the assumptions that move the estimate
Add a scenario with twenty extra revision hours. At the illustrative rate, the total becomes 9,500 rather than 8,500 units. This does not predict how often revisions occur; it shows sensitivity. Identify possible triggers: late evidence, a changed objective, an unavailable approver or incompatible local versions.
For the European launch, compare one verified technical base with controlled local adaptation against several teams repeatedly checking the same claims. The aim is not to prohibit useful differences. It is to clarify which facts must stay aligned and which explanations need local work. Assign a version owner so that reuse does not quietly spread a statement that has ceased to be accurate.
5. Compare delivery models on the same terms
Buying external production usually leaves internal briefing and decision work. Internal production may still need specialist design, research or language support. Compare internal, external and mixed options using the same result, quality threshold, timing and responsibility for corrections. The quoted price alone does not show whether a model can deliver the required outcome.
After a pilot, collect effort by broad task categories without turning estimation into disproportionate individual monitoring. The purpose is to improve the process, not to equate visible activity with performance. Check applicable rules and internal policies before collecting identifiable employee data; aggregated information may answer the costing question adequately. Record limitations when estimates rely on recollection rather than contemporaneous logs.
6. Bring evidence to the first discussion
Prepare a recent brief, delivered assets, approval stages, invoices and an aggregated estimate of time. Include expected updates and work postponed to complete the campaign. That material supports a focused discussion about omitted costs, sensitive assumptions and one delivery option worth testing.
Belief System supports communications department organisation and communications strategy. A useful output is an annotated cost model tied to a defined service. It enables a defensible, revisable decision without presenting either insourcing or outsourcing as automatically cheaper, and without claiming a cash saving that the organisation cannot actually realise.